Boiler Steam Amalgamation Safety Requirements

Boiler steam amalgamation safety requirements is the operation of combining multiple boilers and steams in the case that one boiler of your company can not meet your daily needs. The operation difficulty is relatively high, and the requirements are relatively high. If the operation is improper, it will lead to air leakage, and the steam quality is not up to standard. Happening! An accident occurred in a serious situation, causing significant property damage. We have made a request for this kind of operation, I hope you follow the following steps.

1. Before the boiler and the steam main pipe are juxtaposed or directly supplied to the steam turbine, the steam pipe should be warmed, and the cold warm pipe time is generally not less than 2 hours.
2. When juxtaposed, care should be taken to keep the steam pressure, steam temperature and water level stable, and slowly increase the boiler evaporation.
3. According to the rise of the steam temperature, the desuperheater is put into operation.
4. When the steam pressure, steam temperature and main steam flow of the boiler meet the turbine cranking conditions, contact the turbine to rush.
5. Boiler steam amalgamation conditions:
1)  When the following conditions are met, contact with the long value and the running positions of the turbine to prepare for steaming.
2)  The boiler has no major defects.
3)  The combustion is stable.
4)  The steam temperature is above 510 °C and not higher than 545 °C.
5)  The steam pressure is lower than the parent pipe pressure by 0.1-0.2 MPa.
6)  The steam quality is qualified.
6. Boiler steam amalgamation considerations:
1)  Keep steam temperature, steam pressure and combustion stable.
2)  The water level of the drum is slightly lower than the normal water level by 30 to 50 mm.
3)  Open slowly and open the door slightly bypass until it is fully open, and pay attention to the temperature changes on both sides of the furnace door.
If the main steam pipe is impacted by water, stop the steam amalgamation and strengthen the water dredging immediately. After the impact is eliminated, the steam addition is combined.
Boiler steam amalgamation can only meet the daily needs of steam by adding new boilers without replacing the boiler. It can be said that you have saved a lot of budget. It also provides another idea for the new plant – multiple low-power boilers are equivalent to a high-power boiler!

If you have any problems or needs in the boiler, you can contact our customer service at any time, our customer service is available 24 hours online. With 35 years of experience in boiler manufacturing, we offer a complete range of boiler solutions, from boiler selection to boiler room design. One-stop service allows you to buy peace of mind and use peace of mind.