Description
DZL Chain Grate Biomass Fired Steam Boiler Features:
- The body adopts single drum structure, water tube and fire tube mixed design, full layout of heating surface and high thermal efficiency;
- Mechanized combustion;
- Environment friendly and energy saving;
- Complete auxiliaries and high self-control;
- The body and the base are separately delivered.
- The installation cycle is short and the installation cost is low.
- Boiler capacity from 1-35ton/hr, or 0.7-24.5MW, pressure from 7-25bar.
- Multi-fuel burning, coal fired, wood fired, husk and garbage fired, biomass fuel fired.
DZL Chain Grate Biomass Fired Steam Boiler Technical Parameters | ||||||||
Item/Type | DZL1- 1.0-M/ DZL1- 1.25-M |
DZL2 -1.0-M/ DZL2- 1.25-M |
DZL3 -0.7-M/ DZL3- 1.25-M |
DZL4- 1.25-M |
DZL6- 1.25-M |
DZL8- 1.25-M |
DZL10- 1.25-M |
|
Rated capacity t/h | 1 | 2 | 3 | 4 | 6 | 8 | 10 | |
Rated steam pressure Mpa | 1.0/1.25 | 1.0/1.25 | 0.7/1.25 | 1.25 | 1.25 | 1.25 | 1.25 | |
Rated Steam Temperature degree | 184/194 | 184/194 | 170/194 | 194 | 194 | 194 | 194 | |
Feed water temperature degree | 20 | 20 | 20 | 20 | 20 | 60 | 105 | |
Boiler Thermal efficiency % | 80 | 80 | 81 | 81 | 83 | 85 | 87 | |
Fuel Consumption kg/h | 179 | 358 | 531 | 707 | 1036 | 1382 | 1648 | |
Effictive area of grate degree | 1.8 | 3.04 | 3.34 | 5.14 | 8.12 | 10.9 | 12 | |
Max. transport size | L (mm) | 4876 | 5290 | 5360 | 6258 | 6630 | 7486 | 7600 |
W (mm) | 1800 | 2240 | 2240 | 2700 | 3150 | 3200 | 3200 | |
H (mm) | 2870 | 3400 | 3500 | 3814 | 4186 | 3650 | 4000 | |
Weight of largest parts of boiler transporting (T) | 13.5/14.2 | 20.8/21.8 | 22.1/23 | 29 | 32 | 35 | 47 | |
Note: This is simple parameters for reference, if you need more please add my skype: epcbsale27 . |
Boiler Advantage:
- Safety: With water level, leakage steam, steam pressure control. Make sure boiler working safety.
- Product quality ensured by: Strength calculation report, hydraulic test, X-ray, non-destructive test.
- Efficient: Well insulation and excellent structure.
- Spirally corrugated tube increase the strength and also meets the needs of heat expansion of each parts.
- Welding: Welding mainly uses advanced automatic welding, gas protected welding, TIG welding. Drum and other main pressure parts adopt CNC automatic welding, all of the welding 100% passed penetrant inspection.
Factory assurance:
- One year parts warranty
- Spare parts available at ex-factory price
- Different voltage available
- 100% tested before delivery
- Engineer on-site instruction of installation and commissioning available.
After-sale services:
- Assist clients to prepare for the first construction, and also can arrange engineer on-site instruction of installation and commissioning
- Install and debug the equipment;
- Train the first-line operators;
- Examine the equipment;